Engineering Case Studies

Recently Upgraded ISO Standards

ISO Standards NSAI have recently carried out a surveillance audit of our Management System Standards. The purpose of this audit is to ensure our Management System is being maintained and is achieving its expected outcomes. As we constantly strive to provide both; a quality assured service to our customers as […]

COVID-19 Update – Operating as Normal.

To our valued customers – Avonmore electrical is an essential service and remains operational, Our workshop and emergency call out service coupled with sales of essential goods are operating as normal, please call our office for assistance or any of our sales representatives numbers and details available from our website […]

Avonmore Electrical – Update COVID-19 – Open for Business

Although we are currently working in challenging times and taking all the necessary precautions to protect staff and customers alike we at Avonmore Electrical are taking in daily consignments of stock from our trusted partners globally. We are currently fully stocked with all our well known brands, ABB electric motors […]

Wind Farm Site Services

Our engineering team recently undertook a project within the wind sector. The original enclosures and transformers at this 37.5 MW, 15+ year-old wind farm posed an operational, environmental and security risk for our client. Following a site visit and in conjunction with the client, the newly upgraded enclosures (3mm galvanized […]

Energy Saving Upgrades Using Fine Bubble Diffused Aeration

With ever increasing energy costs, Avonmore Electrical has identified the need for an energy reduction benefit as part of every new project. A recent example of this is the contract for the upgrade of Listowel STW Aeration Basin. THE TASK The works involved the replacement of mechanical surface aerators with […]

Pump Replacement Through Modification

RO FEED PUMP, DIW GENERATION PLANT Failed in service on Friday 17th of July due to severe wear on the Pump Coupling, Pump Shaft and Motor Drive Shaft, both Pump Shaft & Motor Shaft were deemed irreparable. A direct replacement pump was not available from Grundfos, as the pump was deemed […]