Although we are currently working in challenging times and taking all the necessary precautions to protect staff and customers alike we at Avonmore Electrical are taking in daily consignments of stock from our trusted partners globally. We are currently fully stocked with all our well known brands, ABB electric motors […]
Case Studies
UV Treatment System ready for dispatch and subsequent installation by Avonmore Electrical
UV Treatment System with auxiliary UVT Monitor and Data Logger for an immediate, short-term water quality solution, ready for dispatch and subsequent installation by Avonmore Electrical. Critical data obtained from this piece of equipment will assist in the design of a long-term, permanent solution. For more information on our Water […]
Servo Motor Reliability Tip #1 – How to identify a servo motor.
See our Servo Motor Specialist Dermot Murphy discuss the key attributes of a servo motor. But more importantly, hear about how important it is to send a servo motor to a dedicated repair center for guaranteed reliability.
Wind Farm Site Services
Our engineering team recently undertook a project within the wind sector. The original enclosures and transformers at this 37.5 MW, 15+ year-old wind farm posed an operational, environmental and security risk for our client. Following a site visit and in conjunction with the client, the newly upgraded enclosures (3mm galvanized […]
Pump Efficiency Upgrade using state-of-the-art SynRM Technology
Avonmore Electrical lead the way in Pump Selection and Pumping Upgrades. Selection of the most appropriate pumping technologies is critical to the efficiency of your plant. See a recent project below where Avonmore used ABB SynRM technology to do just that.
Overhaul of Auxiliary and Main Generator Exciters by Avonmore Electrical
See clip below for footage of the overhaul of 550 kVA Auxiliary and 5500 kW Main Generator Exciters recently completed by Avonmore Electrical.
Overhaul and Re-Installation of 700kW Bedford Pump
Another busy week saw our expert team of site engineers re-install a 700kW Bedford Pump which had been overhauled in the Avonmore Electrical Workshop.
Bearing Failure in 3.1MW Motor
3100kW HELMKE SLIP-RING MOTOR | 496rpm | 6000V | 24100kg (Motor Upon Arrival to Avonmore Electrical) Through the customer’s own predictive maintenance methods; high GSE levels and irregular sounds coming from this 3.1MW Helmke Slip-Ring Motor, were detected. It was therefore shipped directly to our Workshop HQ in Cork. Working […]
Energy Saving Project – Recirculation Pumps
Tralee Aquadome Recircirculation Pumps THE PROBLEM Inefficient pumps and control methods were being utilised. THE SOLUTION 2 X 15Kw Pumps were re-selected based on the actual site requirement,and powered using variable speed drives rather than fixed speed. THE RESULT The net result was a saving of 12% on electricity usage,which […]
Disinfection Equipment Upgrade
Disinfection Equipment Upgrade at Montpelier Pump House With an existing system consisting of a single chlorine dosing pump, manually controlled with manual preparation of solution, Avonmore Electrical were tasked with the upgrade of disinfection equipment. THE TASK Scope included the installation of; A fully automatic Duty/Standby UV disinfection system. D/S […]